Our Muş TM transformer was put into operation after the disaster, while having intervened for the repair

Our Muş TM transformer was put into operation after the disaster, while having intervened for the repair

In order to meet the energy needs of the region, our Muş TM transformer with serial number 50799 was switched on after the disaster while taking action for the repair.